Meet the Team
Delivering Sustainability without Sacrifice
Our team has a proven passion for sustainable design solutions using the Earth’s materials to cleanse and heal our planet.
Headed by a clean-tech veteran & co-founded by a team of renowned scientists and engineers from the University of Colorado Boulder, we are inspired by processes in nature and how we can learn from them to generate clean and efficient results to support the build industry and therefore our planet.
Loren Burnett
President, CEO and Co-founder
Loren Burnett
President, CEO and Co-founder
Stephen Bell, PhD
Director of Biotechnology
Stephen Bell, PhD
Director of Biotechnology
Sherri Cook, PhD
Advisor and Co-founder
Jaclyn Gruber
Chief Marketing Officer
Jaclyn Gruber
Chief Marketing Officer
John Hottle, PhD
Director of Research & Development
John Hottle, PhD
Director of Research & Development
Mija Hubler, PhD
Engineering Advisor and Co-founder
Mija Hubler, PhD
Engineering Advisor and Co-founder
Wil Srubar III, PhD
Technology Advisor and Co-founder
Wil Srubar III, PhD
Technology Advisor and Co-founder
Colin Tansey
Manager of Manufacturing and Operations
Colin Tansey
Manager of Manufacturing and Operations
The Prometheus Materials Mission
Be a leading provider of reduced carbon cement technology to the entire cement & concrete industry and accelerate the world's future to carbon negative.
Board of Directors
Loren Burnett
Loren Burnett
Joško Bobanović
Joško Bobanović
Vishaan Chakrabarti, FAIA FRAIC
Vishaan Chakrabarti, FAIA FRAIC
Answers to our most frequently asked questions
Where do you grow the algae?
We have strategic partners that are based in key growing climates to ensure efficiencies and effectiveness of the algae
Do you have EPDs?
Given the timeframe requirement for an EPD, we have a third-party LCA that demonstrates our GWP.
How is the performance of ProZERO™ compared to traditional concrete?
- We can achieve compressive strengths from flowable fill (150 PSI) up to 6000 PSI in both interior and exterior applications.
- As a result of our proprietary blended SCM formulation, we are able to maintain the same long-term performance expected from traditional cement and concrete
What’s the dosage of ProZERO™ needed for a typical mix?
Dosage is based on project goals and mix specifications. For ready-mix producers, this is typically set by targeted cement replacement levels (10–40%). We work with suppliers to determine the appropriate replacement percentage needed to meet targeted GWP and carbon reduction goals within your local market.
Who does the testing prior to a pour?
We recommend that you or your lab conduct testing using your own materials and placement practices. We provide mix guidance and technical support throughout the process.
What do our ready-mix suppliers need to do to integrate your product into our mixes?
ProZERO™ integrates similarly to other OPC replacements (slag, natural pozzolan, fly ash, limestone, etc.). Suppliers can use existing handling and batching practices. We work with suppliers to determine the best delivery method. ProZERO™ has been delivered to partners, job sites, and batch plants via bags, super sacks, and bulker trailers.
Shelf life?
Materials are stable under standard conditions. Store dry and protected from moisture.
How much does it cost?
ProZERO™ is sold by the ton. Because ProZERO™ is a concentrated carbon reducer, the cost impact is determined by the replacement percentage in the concrete design. The cost per ton is $850. Since ProZERO™ delivers high carbon reduction efficiency, suppliers need a small amount in the mix design to achieve results.
Which sealer do we recommend?
We don’t have a specific sealer requirement. Water-and saline-based sealers that have been tested have performed similarly to normal OPC.
Which aggregate do we recommend?
We have not seen adverse interactions with typical aggregates. Your local aggregate of choice will work. If using special or novel aggregates, additional testing may be required.
Lightweight concrete over metal deck
We expect this application to be viable, though it has not yet been formally tested. A trial batch is recommended prior to deployment.
Shipping
Trailer or bulker. Shipping is at the cost of the buyer, FOB Longmont CO.
Short ton or metric ton
Short ton.